BENI HAROUN (PK9 TUNNEL, PUMPING LINE) POTABLE WATER PIPELINE

The construction of a 4,2 km long pipeline project which includes 3,850 m long tunnel with an excavation diameter of 6,1 m, opened with a tunnel boring machine (TBM).

PIPELINE CONSTRUCTIONS

The project is under construction to supply water to the Atmania region in Algeria. 

Back